Sign In | Join Free | My chinaqualitycrafts.com |
|
Brand Name : Ze Xu
Model Number : Customized by pipeline
Certification : API 、CE
Place of Origin : Yanshan, Hebei, China
MOQ : 1 pcs
Price : $10 pcs
Payment Terms : T/T
Supply Ability : 4000 pieces per week
Delivery Time : 3-5 work days
Packaging Details : Wooden case, pallet or according to customer's request
Matreial : aluminum
Shape : rectangle
Connection mode : bolt
Nickname (s) : Aluminum target plate soot blowing
delivery port : Tianjin Port
Special function : finish
Purpose : Pipeline purging
Standard : according to the drawing processing
Aluminum Target Plate For Boiler Steam Purging
pipe →temporary pipe → target plat →temporary pipe → atmosphere.
Other disposal and requirement for temporary pipe of steam blowing
1) All temporary pipelines before target plate should be based by argon arc weld, be treated by sandblast before installation and be carried out inner cleaning, finally accepted.
|
2) The temporary valves should be controlled at central control room.
|
3) The temporary pipe must be hanged and supported reliably and permit thermal expansion. |
4) The temporary pipe must be insulated.
|
|
6) Disconnect the drainage pipes from main steam, RH steam, and HP/LP bypass to flash tank, and install temporary pipes to drain.
|
7) Mechanically purge the pipes which are not blown.
|
Avoid second pollution during the system restoring.
Steam blowing
6.1 Necessary precondition check
Before boiler steam blowing, necessary precondition should be check according appendix I, the boiler steam blowing will be carried out when all of preconditions are satisfied,
6.2 Boiler steam blowing parameter
Trial steam blowing :
open temporary valves when drum pressure atrespectively | close temporary valves when drum pressure at respectively |
2.0~2.2 MPa | 1.4 MPa |
3.0~3.3 MPa | 2.0 MPa |
4.0~4.4 MPa | 3.0 MPa |
![]() |