API Bolt Rectangle Target Plate For Steam Blowing

Hebei Zexu Pipe Manufacturing Co., Ltd.
Contact Now

API Bolt Rectangle Target Plate For Steam Blowing

  • 1
  • 2
  • 3

Brand Name : Ze Xu

Model Number : Customized by pipeline

Certification : API 、CE

Place of Origin : Yanshan, Hebei, China

MOQ : 1 pcs

Price : $10 pcs

Payment Terms : T/T

Supply Ability : 4000 pieces per week

Delivery Time : 3-5 work days

Packaging Details : Wooden case, pallet or according to customer's request

Matreial : aluminum

Shape : rectangle

Connection mode : bolt

Nickname (s) : Aluminum target plate soot blowing

delivery port : Tianjin Port

Special function : finish

Purpose : Pipeline purging

Standard : according to the drawing processing

Contact Now

Aluminum Target Plate For Boiler Steam Purging

pipe →temporary pipe → target plat →temporary pipe → atmosphere.

Other disposal and requirement for temporary pipe of steam blowing

1) All temporary pipelines before target plate should be based by argon arc weld, be treated by sandblast before installation and be carried out inner cleaning, finally accepted.

2) The temporary valves should be controlled at central control room.

3) The temporary pipe must be hanged and supported reliably and permit thermal expansion.

4) The temporary pipe must be insulated.


5) Drainage pipe and valves must be installed at each lowest point.

6) Disconnect the drainage pipes from main steam, RH steam, and HP/LP bypass to flash tank, and install temporary pipes to drain.

7) Mechanically purge the pipes which are not blown.

Avoid second pollution during the system restoring.

API Bolt Rectangle Target Plate For Steam Blowing

Steam blowing
6.1 Necessary precondition check
Before boiler steam blowing, necessary precondition should be check according appendix I, the boiler steam blowing will be carried out when all of preconditions are satisfied,
6.2 Boiler steam blowing parameter

Trial steam blowing :

open temporary valves when drum pressure atrespectively

close temporary valves when drum pressure at respectively
2.0~2.2 MPa 1.4 MPa
3.0~3.3 MPa 2.0 MPa
4.0~4.4 MPa 3.0 MPa

API Bolt Rectangle Target Plate For Steam BlowingAPI Bolt Rectangle Target Plate For Steam BlowingAPI Bolt Rectangle Target Plate For Steam Blowing


Product Tags:

target plate for steam blowing

      

API target plate for steam blowing

      

bolt target plate for steam blowing

      
Quality API Bolt Rectangle Target Plate For Steam Blowing for sale

API Bolt Rectangle Target Plate For Steam Blowing Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Hebei Zexu Pipe Manufacturing Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)