6mm Purge Test Rectangle Target Plate Steam Blowing

Hebei Zexu Pipe Manufacturing Co., Ltd.
Contact Now

6mm Purge Test Rectangle Target Plate Steam Blowing

  • 1
  • 2
  • 3

Brand Name : zexu

Model Number : custom made

Certification : CE API ISO9001

Place of Origin : Hebei china

MOQ : 1pcs

Price : 12-2700USD

Payment Terms : T/T

Supply Ability : 15110ton/Year

Delivery Time : 5work days

Packaging Details : Export wooden boxes and pallets or according to customer requirements

name : target board

Material : Al Cu

Color : same as the picture

unit : Piece

use : Pipeline steam purge

model : According to the picture processing

shape : rectangle

Surface treatment : polishing

Contact Now

Purge Test Of High-Pressure Steam Purging Aluminum Target Board Pipeline

After the purge process piping system is installed, it can be blown by air or steam according to the working conditions of the working medium and the degree of dirt on the inner surface of the pipe. The general requirements for pipe purge are:
Equipment and pipes that are not allowed to be purged should be isolated from the purging system.
Before the pipeline is purged, orifice plates, flange-connected regulating valves, main valves, throttle valves, safety valves, instruments, etc. should not be installed. For the above-mentioned valves and instruments connected by welding, the bypass should be used or the seal should be removed. Protective measures such as pieces.
The order of purging should be carried out in the order of main pipe, branch pipe, and drain pipe. The blown out dirt must not enter the pipe that has been purged.

The dirt discharged by purging shall not pollute the environment, and random discharge is strictly prohibited.
A restricted area should be set before purging.
After the pipeline has been purged qualified, other operations that affect the cleaning shall not be carried out.

Air purge
1. In the process pipeline, all pipelines that transport gaseous media are generally purged with air.
2. Air purging should use the large compressor of the production unit, or the large container in the unit for intermittent purging; the purging pressure should not exceed the design pressure of the container and pipeline, and the flow rate should not be less than 20m/s.
3. When purging oil-free pipelines, use oil-free compressed air.
4. The inspection method of air purging is to inspect the target board with white cloth or white paint at the exhaust port of the purging pipe. No rust, dirt, or other dirt on the target board within 5 minutes is qualified.
5. The angle between the purge port and the ground should be between 30 degrees and 45 degrees. The pipe section of the purge port and the pipe section of the purge port must be welded gently, and the diameter of the purge port meets the requirements.
6. The length of each purge should not exceed 500 meters. When the length of the pipeline exceeds 500 meters, it should be purged in sections.

Steam purge
1. Steam purging is suitable for conveying power steam pipelines or thermal pipelines. Non-thermal pipelines are not suitable for steam purging because heat expansion and other issues are not considered in the design.
2. Steam purging should be carried out with a large flow of steam, and the flow rate should not be less than 30m/s.
3. Before steam purging, the pipes should be heated and drained in time to check the thermal displacement of the pipes.
4. Steam purging should be carried out by steam-slowly rising warm tube-constant temperature for 1h-purging-stop air cooling-reheating pipe heating, constant temperature, second purging, such repetition is generally not less than 3 Times.
5. Medium and high pressure steam pipes and steam turbine inlet pipes should be inspected with flat and clean aluminum target plates and wooden target plates for low pressure steam. The target plate is placed at the steam outlet and the target plate is qualified if there is no dirt.

product description

name Aluminum target board
Material Al ,Cu
use Power plant pipe cleaning
Type rectangle
thickness 5mm, 6mm, 8mm, 10mm
size According to requirements
Purging requirements Equipment and pipes that are not allowed to be purged should be isolated from the purging systemBefore the pipeline is purged, orifice plates, flange-connected regulating valves, main valves, throttle valves, safety valves, instruments, etc. should not be installed. For the above-mentioned valves and instruments connected by welding, the bypass should be used or the seal should be removed. Protective measures such as pieces.
The order of purging should be carried out in the order of main pipe, branch pipe, and drain pipe. The blown out dirt must not enter the pipe that has been purged.
The dirt discharged by purging shall not pollute the environment, and random discharge is strictly prohibited

6mm Purge Test Rectangle Target Plate Steam Blowing6mm Purge Test Rectangle Target Plate Steam Blowing6mm Purge Test Rectangle Target Plate Steam Blowing


Product Tags:

6mm target plate steam blowing

      

target plate steam blowing 6mm

      

Rectangle target plate steam blowing

      
Quality 6mm Purge Test Rectangle Target Plate Steam Blowing for sale

6mm Purge Test Rectangle Target Plate Steam Blowing Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Hebei Zexu Pipe Manufacturing Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)